Commissioning and pre-operational verification

Control first energization: ITP, LOTO, pre-operational checks, FAT/SAT and traceable reports, through to handover.

Core service

Commissioning is the moment of truth: everything designed, built and installed has to work together, without surprises. FORWA supports manufacturers, contractors and producers at that stage, from turbine-generator units through to interconnection substations.

We establish and apply inspection and test plans (ITP), high-voltage isolation, lockout-tagout (LOTO) and re-energization procedures, with a systematic dead-check.

We carry out pre-operational verifications before energization, functional and input/output testing, dry and load testing, and factory and site acceptance testing (FAT/SAT), through to handover. Every step is recorded in traceable test reports.

References: Wreck Cove (GE Vernova / Nova Scotia Power), BC Hydro Site C (AtkinsRéalis), Calabogie (SNC-Sullivan / OPG), Ranney Falls (ANDRITZ / OPG), Chenaux and Otto Holden.

What we offer

  • Inspection and test plans (ITP)
  • HV isolation, lockout-tagout (LOTO) and re-energization
  • Pre-operational verifications before energization
  • Functional and input/output testing
  • Dry and load testing
  • Factory and site acceptance testing (FAT/SAT)
  • Traceable test reports

Benefits

  • Safe, controlled energization
  • Defensible documentation compliance
  • Fewer surprises at synchronization
  • One partner from FAT through handover

Applications

  • Turbine-generator units
  • Interconnection substations
  • Medium and high voltage systems
  • Unit control boards (UCB)
  • Governors and excitation systems