Ranney Falls Expansion G3
FORWA’s significant contribution to the installation and commissioning of a 10MW Ecobuld from Andritz at Ranney Falls. Detailed involvement in the pre-testing phase in the shop, marking the beginning of a 2-year extensive project.
- Post-reassembly offline stator FAT test
- Neutral CTs FAT test
- Installation and cabling of instruments
- On-Site Test/Work:
- Offline stator test post-reinstallation
- Neutral CTs and cable testing post-reinstallation
- Maintenance tests on MTO and auxiliary transformer
- Maintenance of 44KV equipment (including motorized switch, breaker, inductor)
- Maintenance and modification of the 5KV switchgear
- Diagnostic work on the DSVC (in collaboration with GE)
- Maintenance tests on 600V and DC distribution
- Modification of P&C panel
- Instrumentation verification
- Auxiliary system troubleshooting (HPU, Governor, ATS)
- Support for third-party Index testing
Additional Responsibilities:
- In charge of Lock Out Tag Out (LOTO) processes
- Replacement of the site superintendent
- Commissioning support