Calabogie OPG Station Redevelopment
Highlighting FORWA’s essential role in executing extensive pre-operational testing at the Calabogie OPG Station, ensuring the optimal performance of critical system components.
A six-month project that not only demonstrated FORWA’s technical proficiency but also earned accolades for flexibility and collaboration.
44KV Substation Pre-Operational Tests:
- Ground Testing
- Motorized Switch Assessment
- Breaker Functionality Checks
- Testing PTs (Potential Transformers) and Metering Box
Powerhouse Pre-Operational Tests:
- Evaluation of MOT (Main Output Transformer) and Auxiliary Service Transformer
- 44KV and 5KV Cable Testing
- 5KV Switchgear Analysis
- Protection and Control (P&C) Verifications
- Section 3: Commissioning and Additional Achievements
Commissioning of the 44KV Substation and MOT
- Generator Site Acceptance Test (SAT)
- CTs and PTs SAT
- General P&C Verification and Troubleshooting
- Instrumentation Verifications
- Dry and Wet Commissioning Processes